We have survived (John might not agree to survive...he has suffered a little) 7 months of not having my entire kitchen. 2 months in the "pretend house" and then the rest of the time in this house with a partial kitchen (fully functional with sink, cook top, oven, etc).
The counter tops have been delayed (4 weeks) due to the high cost of fuel, the ship in Hong Kong was delayed until it was full. I still plan on unpacking without counter tops, we just won't have a sink installed. Hopefully a cook top in a makeshift counter top section. We have been eating pretty normal, it is the cleanup that is tricky...water is in the laundry room. I have missed having my cook top. Gravy, pancakes, etc.
This should be the last big project. The lawn is slowly coming back to life. It was in bad shape due to neglect. A leak in the hot tub needs to be located. John drained the hot tub until he can get around to it.
Windows are in the future...hopefully years down the road.
The counter tops have been delayed (4 weeks) due to the high cost of fuel, the ship in Hong Kong was delayed until it was full. I still plan on unpacking without counter tops, we just won't have a sink installed. Hopefully a cook top in a makeshift counter top section. We have been eating pretty normal, it is the cleanup that is tricky...water is in the laundry room. I have missed having my cook top. Gravy, pancakes, etc.
This should be the last big project. The lawn is slowly coming back to life. It was in bad shape due to neglect. A leak in the hot tub needs to be located. John drained the hot tub until he can get around to it.
Windows are in the future...hopefully years down the road.